Dickinson, North Dakota
This project consisted of the complete site work construction for a 40-acre facility including, parking, truck wash building, chemical building, administration headquarters, truck maintenance shop and Baroid facility. An overview of this project entailed approximately 100,000 CY of earthwork, soil stabilization with geogrid, 75,000 TNS of Aggregate Surfacing and storm drainage, waterline installation, all wet utilities. Waterline construction consisted of approximately 5,200 lf of 10”, 8” and 6” C-900, 14 Fire Hydrants, fittings, services and municipal tie in connections to existing water lines. Sanitary Sewer Improvements consisted of 6,400 lf of 8” SDR 35 ranging in depths of 9’ to 14’ including trench dewatering, Type II Bedding, and import backfill material. Storm Drainage Improvements included 4,300 lf of RCP pipe installation with sizes ranging from 48” to 24” including outlet structures, Manholes, Inlets, and Rip Rap channel.
- Project Name: Halliburton Field Camp Facility
- Project Location: Dickinson, North Dakota
- Project Value: $6,730,000