DUBOIS, WYOMING
JR Civil was contracted to perform the cleaning and replacement of Cell #2 at the Dubois, WY Waste Water Treatment Plant. The project consisted of removing approximately 3,000 CY of sludge, replacing approximately 11,400 SY of 60-mil geomembrane liner, geocomposite strips, liner vents, and baffles.
- Project Name: WWTP Cell #2 Relining
- Project Location: Dubois, Wyoming
- Project Value: $532,000
![5](https://jrcivil.com/wp-content/uploads/2021/06/5.jpg)
![1](https://jrcivil.com/wp-content/uploads/2021/06/1.jpg)
![2](https://jrcivil.com/wp-content/uploads/2021/06/2.jpg)
![3](https://jrcivil.com/wp-content/uploads/2021/06/3.jpg)
![4](https://jrcivil.com/wp-content/uploads/2021/06/4.jpg)
![6](https://jrcivil.com/wp-content/uploads/2021/06/6.jpg)
![7](https://jrcivil.com/wp-content/uploads/2021/06/7.jpg)
![8](https://jrcivil.com/wp-content/uploads/2021/06/8.jpg)
![9](https://jrcivil.com/wp-content/uploads/2021/06/9-scaled.jpeg)
![10](https://jrcivil.com/wp-content/uploads/2021/06/10.jpeg)
![11](https://jrcivil.com/wp-content/uploads/2021/06/11.jpeg)